Renovation Guides · Design Authority Singapore
Singapore renovation costs in 2026 range from $15,400 to $600,000+ depending on property type. Complete breakdown for HDB BTO, resale flats, condos and landed homes — with real market rates and budgeting tips.
HDB flats remain the most common renovation project in Singapore. Costs are driven by flat size, whether it’s a BTO or resale unit, design style, and material choices.
| Flat Type | Typical Floor Area | Cost Range (2026) |
|---|---|---|
| 2-Room BTO | ~45 sqm | $15,400 – $31,600 |
| 3-Room BTO | ~65 sqm | $32,800 – $51,500 |
| 4-Room BTO | ~90 sqm | $40,300 – $62,300 |
| 5-Room BTO | ~110 sqm | $44,700 – $69,800 |
| 3-Gen BTO | ~115 sqm | $73,000 – $103,800 |
| Executive HDB | ~130 sqm | $83,500 – $118,200 |
| Maisonette | ~145 sqm | $91,200 – $134,800 |
| Flat Type | Cost Range (2026) | Key Added Works |
|---|---|---|
| 2-Room Resale | $28,100 – $41,300 | Hacking, rewiring |
| 3-Room Resale | $42,900 – $66,600 | Full retiling, plumbing |
| 4-Room Resale | $55,700 – $80,400 | Hacking, waterproofing |
| 5-Room Resale | $64,300 – $92,600 | Structural, electrical |
| Jumbo HDB | $101,000 – $155,900 | Full overhaul |
| Unit Type | New Condo | Resale Condo |
|---|---|---|
| Studio / 1-Bedroom | $15,400 – $37,300 | $30,000 – $50,000 |
| 2-Bedroom | $24,800 – $48,200 | $47,900 – $71,100 |
| 3-Bedroom | $32,200 – $68,500 | $60,400 – $84,100 |
| 4-Bedroom | $41,700 – $72,900 | $66,300 – $92,400 |
| Penthouse | $122,700 – $181,100+ | $150,000+ |
| Property Type | Typical Range | Notes |
|---|---|---|
| Terrace House (light) | $80,000 – $150,000 | Kitchen, bathrooms, finishes |
| Terrace House (full) | $150,000 – $200,000 | Full room-by-room overhaul |
| Semi-Detached | $150,000 – $350,000 | Larger façade, more wet areas |
| Bungalow | $300,000 – $600,000+ | Scale, custom detailing |
| A&A / Reconstruction | $600,000+ | URA/BCA approvals required |
Renovation costs in Singapore are higher in 2026 due to rising material costs, labour costs, and stricter project constraints for resale, condo, and landed properties.
| Work Category | Typical Cost Range | % of Total Budget |
|---|---|---|
| Carpentry (built-ins, wardrobes, kitchen) | $8,000 – $30,000+ | 25–40% |
| Masonry / Tiling | $5,000 – $20,000 | 15–25% |
| Electrical Works | $3,000 – $12,000 | 8–15% |
| Plumbing | $2,000 – $8,000 | 5–10% |
| Painting | $1,500 – $5,000 | 5–8% |
| False Ceiling / Lighting | $2,000 – $8,000 | 5–10% |
| Flooring | $3,000 – $12,000 | 8–12% |
| Hacking / Demolition (resale) | $3,000 – $8,000 | 5–10% |
| Waterproofing | $1,500 – $5,000 | 3–5% |
| Work Type | BTO | Resale |
|---|---|---|
| Hacking (tiles, walls) | Rarely needed | Usually required |
| Rewiring / electrical upgrade | Modern wiring, minimal | Often outdated, full rewire |
| Waterproofing (bathrooms) | HDB warranty covers 3 yrs | May be degraded, replacement needed |
| Plumbing | New pipes, minimal work | Old pipes, replacement common |
Functional and clean. Standard laminates, basic carpentry, no feature walls. Good for BTO owners with tight timelines.
Balanced quality. Better materials, more carpentry, feature lighting, some custom elements. Most common range for 4–5 room HDB.
Custom everything. Marble, solid wood joinery, full electrical upgrade, smart home elements, full ID design service.
A 4-room BTO renovation costs $40,300–$62,300. A 4-room resale renovation costs $55,700–$80,400 and can go higher with full infrastructure replacement.
Resale flats require demolition of old fixtures, retiling, rewiring, waterproofing repairs, and plumbing upgrades that BTO owners rarely need. These infrastructure costs add $12,000–$25,000 before any design element is selected.
ID firms typically add 15–30% to renovation costs in exchange for concept design, 3D rendering, and project management. Direct contractors now often provide 3D renders for $300–$500 per room. For complex resale flats, an ID often justifies the premium. For clear-vision BTO owners, going direct saves $8,000–$18,000.
Set aside 10–15% of your total renovation budget. For resale properties, lean toward 15%. Contingency is standard practice, not pessimism.
Get a personalised renovation estimate based on real 2026 Singapore market rates.
Try the Free Calculator